EBM Design

Exterior building maintenance design.

If anyone is going to wash those windows, the building needs an EBM design and an OPOS before the first window washer clips in. We'll produce both, built around the cheapest code-compliant anchor layout.

Request an EBM design quote

Façade access, designed to pass Cal/OSHA the first time.

Hardy Fall Protection provides complete exterior building maintenance (EBM) designs through a strategic partnership with EBM Focus. We use the latest EBM products to deliver the most economical system that meets every Cal/OSHA and OSHA requirement.

Window washing is scheduled maintenance, and window-washing companies have to follow an Operating Procedure Outline Sheet (OPOS). That requires an EBM design. You don't need it to pull the building permit, but you do need it before scheduled maintenance starts, and companies can be fined for working without one.

What's included

  • EBM design documents
  • Specification documents
  • Calculations
  • Detail sheets
  • Operating Procedure Outline Sheet (OPOS), as required by current codes

Load testing is included with all anchor purchases in California.

Exterior building maintenance detail drawing
EBM Focus, façade access specialists

EBM Focus is Hardy's façade access design partner. Together we design EBM systems that meet all Cal/OSHA and OSHA requirements at the lowest installed cost.

Related

One partner from spec to pull test.

Request an EBM design quote