Hardy Fall Protection

Bolted Wall-Mount Tie Back

A tie-back for parapet and wall applications.

  • Custom
  • Made in USA
Hardy Bolted Wall-Mount Tie Back

Built for parapet and wall applications, available in custom sizes, with engineering on request.

  • Parapets + wallsFor parapet and wall applications.
  • Custom sizesMade to fit your wall.
  • Engineering on requestCalculations available.
Hardy Wall Mount

Free EBM design assistance

We'll design the system around it.

Hardy offers complimentary fall protection design services for architects, owners and structural engineers: anchor design and application, best-system analysis and a façade access plan.

EBM design services
Exterior building maintenance anchor layout plan

Frequently asked questions

When are roof tie-backs required?

Under California Code of Regulations Title 8 §3291, every building 3 stories or 36 feet or more in height must have roof tie-backs or other permanent devices at roof level to secure suspended scaffold hooks, clamps and safety lines. Exceptions apply to buildings using other approved permanent rooftop maintenance systems, and to buildings up to 4 stories or 48 feet when maintenance can be done with extension tools, ladders, approved ground equipment or aerial devices.

Do buildings under 36 feet need fall protection anchors?

Yes, when workers routinely approach within 6 feet of a fall hazard. Routine means four or more times a year, and a fall hazard is an elevation difference of 30 inches or more. A parapet or guardrail 42 inches or higher counts as passive fall protection; below 42 inches, a routine-maintenance fall protection system must be designed.

How far apart should tie-backs be spaced?

Approximately 12-foot intervals, depending on the availability of roof framing members strong enough to carry the loads (Title 8 §3291(f)(2)). Tie-backs may go in structural parapets of adequate strength, as close to roof level as practicable.

Does the building need an EBM design?

If the windows will be washed, that's scheduled maintenance, and window-washing companies must follow an Operating Procedure Outline Sheet (OPOS), which requires an exterior building maintenance (EBM) design by a Scaffold, Inspection and Testing (SIT) company. The EBM design and OPOS aren't needed for the building permit, but are required before scheduled maintenance. Without scheduled maintenance, tie-backs are still required at about 12 ft on center.

Quote: Bolted Wall-Mount Tie Back